BWTS Equipment Selection

BWTS equipment selection is done during the feasibility study stage based on the following constraints and inputs.

  • Capacity of Ballast Tanks
  • Capacity of Ballast Pumps
  • Space Availability
  • 3D Scanning Input
  • Cost of installation